Capability D-06 · Soil Mechanics

Building without a soil study risks the entire project.

We reduce risk before any development begins with geotechnical studies that support foundation decisions.

100%
Data-driven decisions
1
Technical report per project
0
Assumptions in the foundation

Building a foundation without soil data costs more later.

Foundation failures almost always stem from decisions made without enough data.

01

Undersized or oversized foundations

Leads to costly structural failures to fix.

02

Differential settlement

Cracks and progressive damage appear in the construction.

03

Decisions without technical backing

Expose the project to avoidable risks.

04

Cost overruns on-site

Fixing issues after construction costs more than studying beforehand.

What Zamaji soil mechanics includes.

Technical studies that support design and foundation decisions.

Code
Service
What it involves
Frequency
G-01
Geotechnical studies
Characterization of the site's subsoil
PROJECT
G-02
Exploration
Borings and open test pits
PROJECT
G-03
Sampling
Collecting samples for laboratory analysis
PROJECT
G-04
Foundation recommendations
Technical report with suggested type and sizing
PROJECT

How we work this capability.

The same Zamaji standard applied to this discipline.

1

Request

We receive the site and project data.

2

Exploration

We carry out borings and sampling on-site.

3

Analysis

We process the samples in the laboratory.

4

Report

We deliver technical foundation recommendations.

5

Support

We answer technical questions during the design phase.

This is what this capability looks like in the field.

Borings and geotechnical exploration carried out by our own team across the Riviera Maya.

Reduce your project's risk from the start.

Request a geotechnical study with no obligation.